10:30 a.m.

Building pit is excavated, cleanness layer filled up: The batchpur plant has arrived!

10:45 a.m.

The batchpur plant is lifted from the lorry directly into the building pit.

11:00 a.m.

The container is straightened before final lowering. The connection work can start.

12:00 a.m.

The batchpur plant is running; the building pit is filled. The control unit can also be installed in the open in the GFK cabinet (protection class IP 56) with comfortable access for you.